Included is a grind of the subfloor and supply and fitting transition/expansion bars. Floor needs to be level/flat to 3mm over 3m and no more than 2mm over 1 lineal metre edge. Floor must be flat. Sub floor must be clean, dry and level. Skirting Boards and toe kicks to be left off/removed prior to installation - not quoted to remove/replace. Also bench ends, walls around fridge, waterfall benches, etc need to be set at a height to allow install of 6.5mm Hybrid flooring to allow for expansion gap. Subject to a site inspection to confirm sizes and profiles. All appliances and toilet fixtures to be removed prior to us arriving. |